Crane Fluid Systems supported the consultant, CBG, in the design and selection of DPZVs for use on the radiator system of Thames Valley Police HQ F Block in Kidlington, Oxfordshire. Crane FS provided a compact and cost effective solution to protect the system from pressure fluxations and maintain low flow rates at low differential pressures.
First phase of the site was completed in January 2024, and the DPZV were commissioned with ease with the setting values only needing a small adjustment to match the consultants requirements.

Related Projects
Crane Fluid Systems supported the extensive redevelopment of a 1980’s office block to provide high quality office space for the City market.
Crane Fluid Systems provided a range of General Valves to the extension of The Lyric Hammersmith Theatre in London.
A learning & teaching hub consisting of two large lecture theatres that can be configured together as one 800-seater.
Crane FS’s DPZVs are selected for use on the radiator system of Thames Valley Police HQ F Block in Kidlington, Oxfordshire
Supplied DPCVs, helping to reduce energy consumption and save money for Kent County Council.