Our genius is valves ®
old-bailey

7-10 Old Bailey

Project Overview

Location

London, UK

Client

MWB Group Ltd 

Architect / Consulting Engineer

Sidell Gibson Architects and Avery Associates

Contractor

Bowen

Distributor

Pipe Centre (Bermondsey) Ltd

Specification

Crane FS Commpac Manifold Systems
Download case study as PDF

CommPac manifolds from Crane Fluid Systems have been installed in the heating and cooling system of this London office building. The construction of No. 7-10 Old Bailey has been designed so that the 6700sqm of new office space can be easily divided into separate units.

Crane's CommPac manifold commissioning system provides one easy point for commissioning multiple terminal units. All site connections can be made without the need to access the internal components, a feature that dramatically reduces commissioning costs and time.

Related Projects
uni-glasgow
Education
University of Glasgow Gilmorehill Campus

A learning & teaching hub consisting of two large lecture theatres that can be configured together as one 800-seater.

DownloadRead Case Study
one-blackfriars
Mixed Development
One Blackfriars Tower, London

Informally known as ‘The Vase’, the development is made up of a 52-storey tower and two smaller buildings for flats, a hotel and retail.

DownloadRead Case Study
great-blakenham
Infrastructure
Great Blakenham Energy from Waste Facility

The Energy from Waste Facility at Great Blakenham, Suffolk will receive and incinerate waste to create energy from homes all over the country.

Read Case Study
Sheldon Square
Commercial
Sheldon Square, London

Over 800 Crane Fluid Systems Dominator Eco units have been selected and installed by MEP contractor MSL in the HVAC system of 3 Sheldon Square, Paddington, London.

Read Case Study
uni-northampton
Education
University of Northampton Waterside Campus

The facility includes 1200 student rooms and a 32 bed hotel.

DownloadRead Case Study