Dominators from Crane Fluid Systems have been installed in the HVAC system for Holiday Inn hotel which forms part of MediaCityUK in Manchester. The glass-fronted, 16 floor hotel boasts 218 ensuite bedrooms, a restaurant, bar and conferencing facilities, all of which are serviced by a state-of-the-art air conditioning system incorporating Dominator flow management modules. In 2012, the Holiday Inn was awarded gold in the Green Tourism Business Scheme.
As part of the 1st phase of Media City UK’s construction, the Holiday Inn sits in the Studio block overlooking the Manchester Ship Canal. Phase 1, which involved regenerating 36 acres of former docklands into a home for UK’s digital and creative multi-media industry, was completed in 2011 and is now home to the BBC North, the University of Salford and Satellite Information Services.
Related Projects
Crane Fluid Systems have supplied Dominator Peak Pro manifold assemblies to Wenlock Works, a major refurbishment in Shepherdess Walk, Shoreditch, London N1.
Crane Fluid Systems supported the extensive redevelopment of a 1980’s office block to provide high quality office space for the City market.
Informally known as ‘The Vase’, the development is made up of a 52-storey tower and two smaller buildings for flats, a hotel and retail.
Supplied DPCVs, helping to reduce energy consumption and save money for Kent County Council.
Crane FS’s DPZVs are selected for use on the radiator system of Thames Valley Police HQ F Block in Kidlington, Oxfordshire