Our genius is valves ®
The-Avenue

Phase III, The Avenues

Project Overview

Location

Kuwait City, Kuwait

Developers

Gensler (London & Los Angeles), Mabanee Co.

Contractors

Bader Al Mulla

Distributor

Asia Electro-Mechanical

Specification

A wide range of traditional and commissioning valves from Crane FS
Download case study as PDF

Phase 3 of Kuwait’s largest shopping destination was completed in 2012 and consists of more than 86,000 square metres of retail space. Located in the Al Rai district of Kuwait City, the mall was designed by London and Los Angeles offices of Gensler, in conjunction with Kuwait developers, Mabanee.

The completed third phase houses 545 retail units. This stage of the project was awarded to Bader Al Mulla, one of Kuwait’s top MEP contractors on a very tight time-scale. Crane Fluid Systems together with their distributor, Asia Electro-Mechanical, committed to holding valve stocks in Kuwait to service this project and ensure no delays. This was a key factor in persuading Bader Al Mulla to place the order for the complete range of valves with Asia / Crane FS.

The first phase of the project opened in April 2007 and includes the largest IKEA in the region, the first Carrefour supermarket in Kuwait and a 10 screen cinema complex. The building design is inspired by the natural forms and elements of the desert. It is also built using environmentally friendly techniques which utilise natural sunlight.

The completed mall includes more than 100 restaurants, a spa, an entertainment centre, a boutique mall, hotels, offices, a convention centre and a theatre.

Published: 2007
Related Projects
cleveland-clinic
Medical
Cleveland Clinic, Abu Dhabi

The ‘state of the art’ hospital has a maximum capacity of 490 beds including floors for clinical and diagnostic work plus 13 floors for critical and acute inpatients.

DownloadRead Case Study
ritz-carlton
Leisure
The Ritz-Carlton, Jordan

A luxury hotel comprising 228 guest rooms, 34 of which are spacious suites.

DownloadRead Case Study
Crossrail
Retail
Crossrail Shopping Centre

Crane Fluid Systems have supplied Butterfly Valves, Cast Iron DRVs, Strainer & Check Valves to Canary Wharf Contractors (Crossrail) Limited, for the Crossrail shopping centre.

Read Case Study
dr-sulaiman
Medical
Dr. Sulaiman Al-Habib Hospital, Al Khobar

Offering a cutting edge virtual healthcare system – ‘Cyber Care’ will provide diagnostic & therapeutic services.

DownloadRead Case Study
akh-tower
Commercial
AKH Tower, Dammam

The 37-story high rise is the new headquarters for Al Abdul Karim Holding (AKH), a major wholesale distributor.

DownloadRead Case Study