Opened in 2005, Hong Kong Disneyland is located on reclaimed land in Penny’s Bay, Lantau Island. The park has a daily capacity of 34,000 visitors the least of all Disneyland parks and attracts around 7 – 8 million visitors annually.
Hong Kong Disneyland currently occupies 49.9 hectares (123 acres) and plans to increase capacity to handle up to 10 million visitors annually over a 15-year expansion period Hong Kong Disneyland had one of the shortest construction period among all the Disneyland theme parks, of just over two years.
Crane FS supplied a selection of General Valves to the build.
Related Projects
This prestigious project utilised a range of Crane FS butterfly, ball and balancing valves for chilled water applications
An imposing 80,000 seater stadium that will host the 2022 World Cup final.
Crane Fluid Systems provided a range of General Valves to the extension of The Lyric Hammersmith Theatre in London.
Various Crane Fluid Systems commissioning valves were used in the build of Ocean Towers, Shanghai.
This HSBC Data Centre is the first standalone data centre in Hong Kong meeting the design requirements of Tier IV standard.