Also known as No. 5 Merchant Square, the Carmine Building overlooks the canal which runs through Paddington and is part of a large area of regeneration in West London. Marks & Spencers have leased seven of the 15 floors as additional office space, as it conveniently sits adjacent to the retailers’ current Waterside House headquarters.
The Crane Fluid Systems Dominators provide heating, ventilation and air conditioning throughout the building. These are a compact prefabricated unit that combine a control valve, flow measurement device, bypass valves, strainer and drain, ready for simple and fast on-site connection to fan coils and other terminal units. All the components are supplied as one tested unit with a known performance, which minimises specification risks and saves valuable time.
For contractors, Imtech Meica, installation of Dominators provides significant reduction in site labour and installation costs because connection is fast and simple.
There is a range of standard Dominator units available and these can also be tailor-made to suit specific needs.
Related Projects

An exciting project in the North West has utilised Crane Fluid Systems valves. The quality and stock availability were key in winning selection for the build.

Comprising 10 floors & 13,000 sq m of contemporary office space in an area seen as the focus for the city’s growing professional, financial and public sector occupiers

The 37-story high rise is the new headquarters for Al Abdul Karim Holding (AKH), a major wholesale distributor.

The new Crane Fluid Systems Dominator Eco has been selected as part of the £40M refurbishment of Star House (Project Tempo) in Maidenhead for Legal & General.

A learning & teaching hub consisting of two large lecture theatres that can be configured together as one 800-seater.