Our genius is valves ®
Dominos

Dominos Pizza HQ

Project Overview

Project

Dominos Pizza HQ - Milton Keynes

Client

Domino’s Pizza Group

Architect/Consulting Engineer

Q2 Architects

Contractor

Walter Miles

Distributor

BSS (Leicester) Ltd.

Specification

Crane FS isolation and commissioning valves
Download case study as PDF

Commissioning valve units, strainers and associated products from Crane Fluid Systems have been installed at the commissary built for Domino’s Pizza Group, the leading pizza delivery company in the UK and Ireland, at West Ashland, Milton Keynes. 

The state of the art facility provides for the planned future growth of Domino’s global business. Over 500 of its stores rely on the commissary for the fresh dough and other ingredients they need to produce pizzas.

Crane’s isolation and commissioning valves play a vital role in managing energy use within the £20 million building. Boasting a compact, space saving design and fast commissioning, they require fewer on-site joints and thus offer considerable installed cost savings.

Designed by Q2 Architects to the highest environmental standards, the new building’s exterior emulates the sleek form of the adjacent MK stadium. It covers an area of 7,400sq m and incorporates production facilities as well as a distribution warehouse.

Related Projects
9-elms
Mixed Development
Nine Elms, London

A modern mixed-use project, using Crane FS’ Dominator Peak Pro

DownloadRead Case Study
spring-mews
Education
Spring Mews Student Accommodation

Crane FS has provided Dominator with PICV units to Spring Mews, Vauxhall, London.

Read Case Study
st-barts-london
Medical
St Barts Hospital, London

Supplying 300 Peak Pro Dominators to London’s oldest hospital

DownloadRead Case Study
Sheldon Square
Commercial
Sheldon Square, London

Over 800 Crane Fluid Systems Dominator Eco units have been selected and installed by MEP contractor MSL in the HVAC system of 3 Sheldon Square, Paddington, London.

Read Case Study
star-house
Commercial
Star House, Maidenhead

The new Crane Fluid Systems Dominator Eco has been selected as part of the £40M refurbishment of Star House (Project Tempo) in Maidenhead for Legal & General.

Read Case Study