<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
king-hussein

King Hussein Business Park, Amman

Project Overview

Location

Amman, Jordan

Sector

Commercial

Client

KHBO King Hussein Business Park Holding company

M&E Consultant

Dar AlHandasa

M&E Contractor

Aysel construction

Distributor

Seasons
Download case study as PDF

One of the HVAC plant rooms at the complex serving 75 international & local companies.

Specification

Crane FS gate, globe, check, strainers, ball, balancing and butterfly valves.

 

Related Projects
Steigenberger Hotel Cairo
Hotels & Leisure
Steigenberger Hotel, Cairo

295 modernly furnished rooms and suites and on-site parking facilities. Meeting rooms are efficiently spread over one floor with a main multi-purpose hall able to take up to 300 guests.

DownloadRead Case Study
headquarters-cs
Commercial
Headquarters Business Park, Jeddah

Includes the 52 floor West Tower, rising 240m high with spectacular views of the city.

DownloadRead Case Study
Sheldon Square
Commercial
Sheldon Square, London

Over 800 Crane Fluid Systems Dominator Eco units have been selected and installed by MEP contractor MSL in the HVAC system of 3 Sheldon Square, Paddington, London.

Read Case Study
crane2137
Commercial
Wenlock Works

Crane Fluid Systems have supplied Dominator Peak Pro manifold assemblies to Wenlock Works, a major refurbishment in Shepherdess Walk, Shoreditch, London N1.

DownloadRead Case Study
fountain-views
Residential
Fountain Views Hotel & Residence, UAE

A high-rise complex that comprises luxury serviced apartments as well as an ‘Address’ branded hotel.

DownloadRead Case Study