<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
king-hussein

King Hussein Business Park, Amman

Project Overview

Location

Amman, Jordan

Sector

Commercial

Client

KHBO King Hussein Business Park Holding company

M&E Consultant

Dar AlHandasa

M&E Contractor

Aysel construction

Distributor

Seasons
Download case study as PDF

One of the HVAC plant rooms at the complex serving 75 international & local companies.

Specification

Crane FS gate, globe, check, strainers, ball, balancing and butterfly valves.

 

Related Projects
Sidra-Hospital
Medical
Sidra Hospital, Doha

A range of valves for a cutting edge hospital in Qatar

DownloadRead Case Study
lusail-stadium
Leisure
Lusail Stadium, Qatar

An imposing 80,000 seater stadium that will host the 2022 World Cup final.

DownloadRead Case Study
Qatar-Rail
Infrastructure
Qatar National Rail Scheme

A 300-kilometre metro network with four lines and 80 stations;

DownloadRead Case Study
dubai-mall
Commercial
The Dubai Mall, UAE

Claimed to be the largest mall in the world – opening with more than 1200 stores.

DownloadRead Case Study
crane2137
Commercial
Wenlock Works

Crane Fluid Systems have supplied Dominator Peak Pro manifold assemblies to Wenlock Works, a major refurbishment in Shepherdess Walk, Shoreditch, London N1.

DownloadRead Case Study