<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
king-hussein

King Hussein Business Park, Amman

Project Overview

Location

Amman, Jordan

Sector

Commercial

Client

KHBO King Hussein Business Park Holding company

M&E Consultant

Dar AlHandasa

M&E Contractor

Aysel construction

Distributor

Seasons
Download case study as PDF

One of the HVAC plant rooms at the complex serving 75 international & local companies.

Specification

Crane FS gate, globe, check, strainers, ball, balancing and butterfly valves.

 

Related Projects
crane2137
Commercial
Wenlock Works

Crane Fluid Systems have supplied Dominator Peak Pro manifold assemblies to Wenlock Works, a major refurbishment in Shepherdess Walk, Shoreditch, London N1.

DownloadRead Case Study
Sheikh-Shakhbout
Medical
Sheikh Shakhbout Medical City, Abu Dhabi

The largest tertiary hospital in UAE – built as part of the Abu Dhabi Economic Vision 2030.

DownloadRead Case Study
Almack House, London
Commercial
Almack House, London

Crane Fluid Systems’ Dominator Eco & Modbus Actuator used for the Almack House Refurbishment

Read Case Study
star-house
Commercial
Star House, Maidenhead

The new Crane Fluid Systems Dominator Eco has been selected as part of the £40M refurbishment of Star House (Project Tempo) in Maidenhead for Legal & General.

Read Case Study
lusail-stadium
Leisure
Lusail Stadium, Qatar

An imposing 80,000 seater stadium that will host the 2022 World Cup final.

DownloadRead Case Study