One of the HVAC plant rooms at the complex serving 75 international & local companies.
Specification
Crane FS gate, globe, check, strainers, ball, balancing and butterfly valves.
Related Projects
The largest tertiary hospital in UAE – built as part of the Abu Dhabi Economic Vision 2030.
295 modernly furnished rooms and suites and on-site parking facilities. Meeting rooms are efficiently spread over one floor with a main multi-purpose hall able to take up to 300 guests.
Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Delta T Services for the new four-pipe fan coil air conditioning system of Chaplin House in Uxbridge, London.
A luxury hotel comprising 228 guest rooms, 34 of which are spacious suites.
The ‘state of the art’ hospital has a maximum capacity of 490 beds including floors for clinical and diagnostic work plus 13 floors for critical and acute inpatients.