<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
king-hussein

King Hussein Business Park, Amman

Project Overview

Location

Amman, Jordan

Sector

Commercial

Client

KHBO King Hussein Business Park Holding company

M&E Consultant

Dar AlHandasa

M&E Contractor

Aysel construction

Distributor

Seasons
Download case study as PDF

One of the HVAC plant rooms at the complex serving 75 international & local companies.

Specification

Crane FS gate, globe, check, strainers, ball, balancing and butterfly valves.

 

Related Projects
riyadh-metro
Infrastructure
Riyadh Metro, Saudi Arabia

An ambitious metro scheme – first stage – to transport 1.1 million people daily around the city.

DownloadRead Case Study
Sheikh-Shakhbout
Medical
Sheikh Shakhbout Medical City, Abu Dhabi

The largest tertiary hospital in UAE – built as part of the Abu Dhabi Economic Vision 2030.

DownloadRead Case Study
crane2137
Commercial
Wenlock Works

Crane Fluid Systems have supplied Dominator Peak Pro manifold assemblies to Wenlock Works, a major refurbishment in Shepherdess Walk, Shoreditch, London N1.

DownloadRead Case Study
100-bishopgate
Commercial
100 Bishopsgate

100 Bishopsgate is a forty storey tower is located in the heart of the city of London and is a mixed-use commercial development.

DownloadRead Case Study
Sheldon Square
Commercial
Sheldon Square, London

Over 800 Crane Fluid Systems Dominator Eco units have been selected and installed by MEP contractor MSL in the HVAC system of 3 Sheldon Square, Paddington, London.

Read Case Study