Our genius is valves ®
100-bishopgate

100 Bishopsgate

Project Overview

Location

London, United Kingdom

Sector

Commercial

Client

Brookfield

M&E Contractor

MJ Lonsdale

Distributor

Pipe Centre - Slough

Architect

Allies & Morrison
Download case study as PDF

100 Bishopsgate is a forty storey tower is located in the heart of the city of London and is a mixed-use commercial development.

The completed project will provide approximately 950,000 ft2 of best in class office and retail accommodation across two buildings, as well as a newly created half-acre public square enlivened with restaurant and retail amenities

Specification

Range of commissioning and general valves.

Related Projects
DSC01481s
Commercial
Chaplin House

Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Delta T Services for the new four-pipe fan coil air conditioning system of Chaplin House in Uxbridge, London.

Read Case Study
one-blackfriars
Mixed Development
One Blackfriars Tower, London

Informally known as ‘The Vase’, the development is made up of a 52-storey tower and two smaller buildings for flats, a hotel and retail.

DownloadRead Case Study
100-bishopgate
Commercial
100 Bishopsgate

100 Bishopsgate is a forty storey tower is located in the heart of the city of London and is a mixed-use commercial development.

DownloadRead Case Study
great-blakenham
Infrastructure
Great Blakenham Energy from Waste Facility

The Energy from Waste Facility at Great Blakenham, Suffolk will receive and incinerate waste to create energy from homes all over the country.

Read Case Study
uni-glasgow
Education
University of Glasgow Gilmorehill Campus

A learning & teaching hub consisting of two large lecture theatres that can be configured together as one 800-seater.

DownloadRead Case Study