The Downtown Line Stage 3 (DTL3) is a 21km, underground, automatic, driverless metro in Singapore. Initiated by the Land Transport Authority (LTA), DTL3 aims to improve rail connectivity between the eastern corridors and the central business district (CBD) while developing the urban Marina Bay area.
Project was supplied with Crane DRV balancing valves installed at the chillers, cooling towers, AHU and FCU.
Related Projects

Crane FS balancing valves and a wide selection of general valves and strainers were specified throughout this prestigious resort.

Balancing valves for a 21km, underground, automatic, driverless metro in Singapore

A 300-kilometre metro network with four lines and 80 stations;

An ambitious metro scheme – first stage – to transport 1.1 million people daily around the city.

This HSBC Data Centre is the first standalone data centre in Hong Kong meeting the design requirements of Tier IV standard.