Claimed to be the largest mall in the world – opening with more than 1200 stores.
An imposing 80,000 seater stadium that will host the 2022 World Cup final.
One of the HVAC plant rooms at the complex serving 75 international & local companies.
A range of valves for a cutting edge hospital in Qatar
A modern mixed-use project, using Crane FS’ Dominator Peak Pro
Supplying 300 Peak Pro Dominators to London’s oldest hospital
Crane FS balancing valves and a wide selection of general valves and strainers were specified throughout this prestigious resort.
A 300-kilometre metro network with four lines and 80 stations;
295 modernly furnished rooms and suites and on-site parking facilities. Meeting rooms are efficiently spread over one floor with a main multi-purpose hall able to take up to 300 guests.
Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Delta T Services for the new four-pipe fan coil air conditioning system of Chaplin House in Uxbridge, London.
Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Michael J Lonsdale Ltd. for the heating and air conditioning system of the Hanover Square development in Mayfair, London.
The new 158 bed hospital, will offer ‘under one roof’ a full range of medical services from inpatient to outpatient care.