<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
aldersgate-manchester

Aldersgate Street, London

Project Overview

Location

London, United Kingdom

Sector

Mixed development

M&E Consultant

Beverley Clinton Morris (BCM)

M&E Contractor

CPL Plumbing & Heating

Distributor

Smith Brothers Stores and Ashworth
Download case study as PDF

Crane Fluid Systems supported the extensive redevelopment of a 1980’s office block to provide high quality office space for the City market.

Specification

Crane FS Double Regulating Valves (DRV), commissioning valves and general valves.

Related Projects
Tate-Modern-case
Leisure
Tate Modern Project

Supplied Dominators and a selection of General Valves to the new extension at the Tate Modern, situated on the banks of the River Thames, London.

Read Case Study
5-broadgate
Financial
5 Broadgate

Crane Fluid Systems has supplied thousands of valves for the core and shell build of 5 Broadgate, located in London’s Square Mile.

Read Case Study
st-barts-london
Medical
St Barts Hospital, London

Supplying 300 Peak Pro Dominators to London’s oldest hospital

DownloadRead Case Study
DSC01481s
Commercial
Chaplin House

Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Delta T Services for the new four-pipe fan coil air conditioning system of Chaplin House in Uxbridge, London.

Read Case Study
Ocean-Towers
Mixed Development
Ocean Towers, Shanghai

Various Crane Fluid Systems commissioning valves were used in the build of Ocean Towers, Shanghai.

Read Case Study