<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
aldersgate-manchester

Aldersgate Street, London

Project Overview

Location

London, United Kingdom

Sector

Mixed development

M&E Consultant

Beverley Clinton Morris (BCM)

M&E Contractor

CPL Plumbing & Heating

Distributor

Smith Brothers Stores and Ashworth
Download case study as PDF

Crane Fluid Systems supported the extensive redevelopment of a 1980’s office block to provide high quality office space for the City market.

Specification

Crane FS Double Regulating Valves (DRV), commissioning valves and general valves.

Related Projects
Tate-Modern-case
Leisure
Tate Modern Project

Supplied Dominators and a selection of General Valves to the new extension at the Tate Modern, situated on the banks of the River Thames, London.

Read Case Study
one-blackfriars
Mixed Development
One Blackfriars Tower, London

Informally known as ‘The Vase’, the development is made up of a 52-storey tower and two smaller buildings for flats, a hotel and retail.

DownloadRead Case Study
crane2137
Commercial
Wenlock Works

Crane Fluid Systems have supplied Dominator Peak Pro manifold assemblies to Wenlock Works, a major refurbishment in Shepherdess Walk, Shoreditch, London N1.

DownloadRead Case Study
spring-mews
Education
Spring Mews Student Accommodation

Crane FS has provided Dominator with PICV units to Spring Mews, Vauxhall, London.

Read Case Study
Ocean-Towers
Mixed Development
Ocean Towers, Shanghai

Various Crane Fluid Systems commissioning valves were used in the build of Ocean Towers, Shanghai.

Read Case Study