Our genius is valves ®
battoyor-tower

Battoyor Tower BHC, Dammam

Project Overview

Location

Dammam, Saudi Arabia

Sector

Residential

Client

Battoyor Holding Company BHC

M&E Consultant

AECOM

M&E Contractor

Ibrahim Asmael

Distributor

ARCOM
Download case study as PDF

High rise – primarily residential building with some floors designated for business use.

Specification

Crane FS HVAC valves

Related Projects
riyadh-metro
Infrastructure
Riyadh Metro, Saudi Arabia

An ambitious metro scheme – first stage – to transport 1.1 million people daily around the city.

DownloadRead Case Study
cleveland-clinic
Medical
Cleveland Clinic, Abu Dhabi

The ‘state of the art’ hospital has a maximum capacity of 490 beds including floors for clinical and diagnostic work plus 13 floors for critical and acute inpatients.

DownloadRead Case Study
Steigenberger Hotel Cairo
Hotels & Leisure
Steigenberger Hotel, Cairo

295 modernly furnished rooms and suites and on-site parking facilities. Meeting rooms are efficiently spread over one floor with a main multi-purpose hall able to take up to 300 guests.

DownloadRead Case Study
kempinski
Hotels & Leisure
Kempenski Hotel Marsa Malaz, Doha

Marsa Malaz Kempinski, the first ultra-luxury hotel to open on Doha’s iconic Pearl Island, comprises 281 rooms, including 73 suites, two Presidential Suites and two Royal Suites.

DownloadRead Case Study
lusail-stadium
Leisure
Lusail Stadium, Qatar

An imposing 80,000 seater stadium that will host the 2022 World Cup final.

DownloadRead Case Study