Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Delta T Services for the new four-pipe fan coil air conditioning system of Chaplin House in Uxbridge, London.
The self-contained office building has undergone comprehensive refurbishments to a Grade A office specification.
Lightweight and modular, the Dominator Peak valve system includes the Peak Pro Pressure Independent Control Valve for accurate flow, temperature and pressure control. The compact units have an integral Venturi metering station for an improved flow range, a small footprint with equal length pipework and the ability to orientate the valve on-site for an easier and faster installation on any fan coil or chilled beam.
The system is able to achieve excellent valve authority at all settings by utilising the Crane FS gap detection actuator. This allows for maximum efficiency gains against required pump settings to achieve the required flow rates.
The Dominator Peak Pro has been designed to deliver and maintain a system that enables energy and cost reduction over its lifetime. Prior to production, the valve has undergone significant design validation testing in accordance with BSRIA BTS01, subjected to 10,000 cycles, which is equivalent to 15 years of typical service, and the performance has remained excellent. In addition, every Peak Pro PICV is tested to in accordance with BSRIA BTS-01, more specifically a Flow Limitation test (FLT).
Related Projects
Crane Fluid Systems have supplied Dominator Peak Pro manifold assemblies to Wenlock Works, a major refurbishment in Shepherdess Walk, Shoreditch, London N1.
Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Michael J Lonsdale Ltd. for the heating and air conditioning system of the Hanover Square development in Mayfair, London.
The new Crane Fluid Systems Dominator Eco has been selected as part of the £40M refurbishment of Star House (Project Tempo) in Maidenhead for Legal & General.
The 37-story high rise is the new headquarters for Al Abdul Karim Holding (AKH), a major wholesale distributor.
Providing PICV valves to the construction of the Manchester’s new arts centre and cultural quarter, First Street.