The Nine Elms N8 Tower development comprises of one, two & three-bedroom flats and penthouses, plus commercial & retail space on the lower levels.
Crane Fluid Systems Dominator Peak Pro with PICV, BSRIA Flushing Drain & FMD along with a range of general valves were chosen for this modern mixed-use project.
Related Projects
![Sheldon Square](https://www.cranefs.com/app/uploads/2024/06/Sheldon-Square-1024x880.webp)
Over 800 Crane Fluid Systems Dominator Eco units have been selected and installed by MEP contractor MSL in the HVAC system of 3 Sheldon Square, Paddington, London.
![one-blackfriars](https://www.cranefs.com/app/uploads/2023/06/one-blackfriars-2-1024x512.jpg)
Informally known as ‘The Vase’, the development is made up of a 52-storey tower and two smaller buildings for flats, a hotel and retail.
![5-broadgate](https://www.cranefs.com/app/uploads/2023/06/5-broadgate-1024x673.jpg)
Crane Fluid Systems has supplied thousands of valves for the core and shell build of 5 Broadgate, located in London’s Square Mile.
![Ocean-Towers](https://www.cranefs.com/app/uploads/2023/06/Ocean-Towers-1024x673.jpg)
Various Crane Fluid Systems commissioning valves were used in the build of Ocean Towers, Shanghai.
![uni-glasgow](https://www.cranefs.com/app/uploads/2023/06/uni-glasgow-1024x512.jpg)
A learning & teaching hub consisting of two large lecture theatres that can be configured together as one 800-seater.