More than 800 Dominators from Crane Fluid Systems were installed in the heating and cooling system of a large new office development in Manchester’s Piccadilly Square.
Specification
Crane FS Dominator valves
Related Projects
Providing PICV valves to the construction of the Manchester’s new arts centre and cultural quarter, First Street.
100 Bishopsgate is a forty storey tower is located in the heart of the city of London and is a mixed-use commercial development.
Informally known as ‘The Vase’, the development is made up of a 52-storey tower and two smaller buildings for flats, a hotel and retail.
Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Michael J Lonsdale Ltd. for the heating and air conditioning system of the Hanover Square development in Mayfair, London.
Crane Fluid Systems have supplied Dominator Peak Pro manifold assemblies to Wenlock Works, a major refurbishment in Shepherdess Walk, Shoreditch, London N1.