A complex that comprises of a hotel, office space, shopping mall and a mosque, plus the country’s first IMAX theatre.
Specification
Crane FS gate, globe, check, strainers, ball, balancing and butterfly valves.
Related Projects
Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Michael J Lonsdale Ltd. for the heating and air conditioning system of the Hanover Square development in Mayfair, London.
A range of Crane FS valve types were specified and installed in the Qatar stadiums
An imposing 80,000 seater stadium that will host the 2022 World Cup final.
Crane Fluid Systems supported the extensive redevelopment of a 1980’s office block to provide high quality office space for the City market.
Offering a cutting edge virtual healthcare system – ‘Cyber Care’ will provide diagnostic & therapeutic services.