Over 800 Crane Fluid Systems Dominator Eco units have been selected and installed by MEP contractor MSL in the HVAC system of 3 Sheldon Square, Paddington, London.
The refurbishment of the 11-storey office building will provide sustainable, high-quality workspaces with a focus on occupant well-being. Building owner British Land are challenging the conventions of corporate workplace design by establishing a connection to nature through a series of cascading hanging balconies.
Selected in line with the project’s sustainability strategy, the Dominator Eco has been engineered with sustainability in mind, delivering accurate flow, temperature, and pressure control to aid HVAC system efficiency.
Furthermore, embodied carbon has been reduced with a 28% shorter and 36% lighter design that is delivered in eco-friendly packaging with a digital installation guide to further minimise the product’s impact on the planet.
Crane BS&U officially launched the Dominator Eco at an event in central London in April this year. Held at the Wellcome Collection, Euston, the event showcased the new Dominator Eco and provided valuable insight into variable volume solutions and sustainability to an audience of building services contractors and consultants.
Dominator Eco installated at Sheldon Place, Paddington
Related Projects
The Energy from Waste Facility at Great Blakenham, Suffolk will receive and incinerate waste to create energy from homes all over the country.
Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Michael J Lonsdale Ltd. for the heating and air conditioning system of the Hanover Square development in Mayfair, London.
Claimed to be the largest mall in the world – opening with more than 1200 stores.
The facility includes 1200 student rooms and a 32 bed hotel.
100 Bishopsgate is a forty storey tower is located in the heart of the city of London and is a mixed-use commercial development.