Our genius is valves ®
st-barts-london

St Barts Hospital, London

Project Overview

Location

London, UK

Consultant

STW Architects

Main Contractor

Kier

Client

Nuffield Health

Channel Partner

Wolseley Bristol

M&E Contractor

Integral

Specification

Crane FS Peak Pro Dominators
Download case study as PDF

Crane Fluid Systems is supplying 300 Peak Pro Dominators to London’s oldest hospital, St Bartholomew’s in the City of London, which is undergoing an extensive modernization of the existing pathology unit and residential staff quarters, to provide a new private hospital for Nuffield Health.

The main contractor is Kier, and Crane FS is working in close partnership with Integral a UK M&E specialist service provider supplying 40mm Dominators for direct connection to fan coil units (FCUs) and 80mm Z9601PF Dominator’s for other terminal units, including chilled beams.These units come complete with integrated PICV and actuator, strainer, flow measurement device and flushing drains. All the valves are pressure tested in accordance with BS EN 12266-1 as well as having a flow limitation test meeting BSRIA standards as per BTS 01.

The final fully assembled manifolds are manufactured in the UK and each one is individually factory tested to ensure the unit meets specification and ensures reduced installation times on site. The 40mm Dominators are being assembled into FCUs by Quartz, with Crane FS working closely alongside Integral to ensure that the proposed units meet the requirements from the designer and provide the greatest energy efficiency and shortest commissioning times possible.

The new ÂŁ60M facility is scheduled to open in the Spring of 2021 and will have 48 bedrooms, 4 state of the art operating theatres and 28 consultation rooms and will specialize in cardiology, cardiac surgery, oncology, and orthopaedics. The building will also provide physiotherapy and diagnostics, as well as in patient and out-patient services.

Published: 2020
Related Projects
DSC01481s
Commercial
Chaplin House

Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Delta T Services for the new four-pipe fan coil air conditioning system of Chaplin House in Uxbridge, London.

Read Case Study
Sheldon Square
Commercial
Sheldon Square, London

Over 800 Crane Fluid Systems Dominator Eco units have been selected and installed by MEP contractor MSL in the HVAC system of 3 Sheldon Square, Paddington, London.

Read Case Study
Al-Salam-Hospitall
Medical
Al Salam Hospital, Al Khobar

A 496 bed hi-tech hospital, which caters for a range of medical care complete with a helipad.

DownloadRead Case Study
Sheikh-Shakhbout
Medical
Sheikh Shakhbout Medical City, Abu Dhabi

The largest tertiary hospital in UAE – built as part of the Abu Dhabi Economic Vision 2030.

DownloadRead Case Study
Crossrail
Retail
Crossrail Shopping Centre

Crane Fluid Systems have supplied Butterfly Valves, Cast Iron DRVs, Strainer & Check Valves to Canary Wharf Contractors (Crossrail) Limited, for the Crossrail shopping centre.

Read Case Study