<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
trinity-gardens-newcastle

Trinity Gardens, Newcastle Upon Tyne

Project Overview

Location

Newcastle-Upon-Tyne, United Kingdom

Sector

Mixed Development

M&E Contractor

Norstead
Download case study as PDF

Dominator Z3000 flow management combination valve units from Crane Fluid Systems were installed in a 60,000 sq ft office development, the centerpiece building within a£55m mixed development known as Trinity Gardens in Newcastle-Upon-Tyne.

Specification

Crane FS Dominator valves.

Related Projects
one-blackfriars
Mixed Development
One Blackfriars Tower, London

Informally known as ‘The Vase’, the development is made up of a 52-storey tower and two smaller buildings for flats, a hotel and retail.

DownloadRead Case Study
uni-glasgow
Education
University of Glasgow Gilmorehill Campus

A learning & teaching hub consisting of two large lecture theatres that can be configured together as one 800-seater.

DownloadRead Case Study
crane2137
Commercial
Wenlock Works

Crane Fluid Systems have supplied Dominator Peak Pro manifold assemblies to Wenlock Works, a major refurbishment in Shepherdess Walk, Shoreditch, London N1.

DownloadRead Case Study
5-broadgate
Financial
5 Broadgate

Crane Fluid Systems has supplied thousands of valves for the core and shell build of 5 Broadgate, located in London’s Square Mile.

Read Case Study
star-house
Commercial
Star House, Maidenhead

The new Crane Fluid Systems Dominator Eco has been selected as part of the £40M refurbishment of Star House (Project Tempo) in Maidenhead for Legal & General.

Read Case Study